21
8.
Verify that all wires connected between the UPS and EBP(s) are installed
behind the front covers and not accessible to users.
9.
Return to Step 4 to continue the UPS installation.
Rackmount converted to Tower
Installation
1
.
Rackmount converted to Tower plastic base installation
① two plastic base brackets ② flatten it after intercrossing
intercross as following Figure
Figure 14 plastic
base installation
③If an EBP is needed to be placed in the middle, the assembly of plastic base
is similar ,
Figure 14
The difference is that two 1U plastic base extended
boards are added in the middle. (as the following shows)
(A) (B)
(C) (D)