background image

 

6

 Installation

WARNING:  DO NOT INSTALL A FLUE DAMPER IN THE EXHAUST VENTING SYSTEM 

OF THIS UNIT. DO NOT CONNECT THIS UNIT TO A CHIMNEY FLUE SERVICING AN

-

OTHER APPLIANCE. DO NOT CONNECT TO ANY DISTRIBUTION DUCT OR SYSTEM.

Unit location

Chimney types

For optimum benefit with your appliance, speak to an authorized Paromax Dealer concerning the unit location.

The location for your appliance can be a factor in how it will perform. Choose an interior location where the vent 

will not be affected by any external interference, ex; trees, bushes, walls or fencing (refer to “Vent Termination 

Requirements” section at page 10). Install the stove according to recommendations made on “clearances” section 

at page 10 or according to the safety label fixed on the unit.

You can use the wall behind the unit to pass the chimney system through a wall, or partition of combustion   con-

struction. The installation shall conform to CAN/CSA-B365. Paromax does not recommend to connect the Rafael 

to an existing chimney type PL of maximum 4” or 10.2 cm inner diameter. Use only an approved double-walled 3” 

inner diameter with horizontal outlet cap inside the existing chimney (see picture of cap on page 12).

Ensure that all clearances to combustibles are met as per the safety label and the diagrams on “Clearances”  

section at page 9. 

This appliance may need outside air if there is a negative pressure within the room where the installation takes 

place. Make sure the outside air supply for the burner does not come from a garage, an attic or any restricted 

non-ventilated space. Air must come from the outside of the house and directly into the room where the stove is 

installed. If using an outside air supply, the unit must be bolted to the floor. See mobile home installation for more 

information. Refer to Outside inlet Installation on page 8.

The flooring under the stove must be a non-combustible material, i.e. cement, ceramics, etc, and must extend of at 

least 6” or 15.2 cm for the sides and 6” or 15.2 cm for the front. Refer to the diagrams on “Clearances” section at 

page 9.

A requirement that a chimney connector shall not pass through an attic or roof space, closet or similar concealed 

space, floor or ceiling. Do not use different brand or models of vent pipe on the same vent pipe installation.

IMPORTANT

 : Always use a double wall 3” or 7.6 cm or 4” or 10.2 cm PL type chimney approved for venting 

wood pellets fuel or agriculture fuel. Use another chimney size will give incorrect results readings. This may even 

cause a malfunction of your device. These cases are not covered by warranty. A minimum of three metal screws 

is recommended to secure each joint of the chimney. A tight seal (silicone or aluminum tape) is recommended on 

each section of the chimney to prevent smoke leakage and odors. 

Gas tight joints :

 The pipe connecting to the 

unit and the outer wall joints located between the pipes also need to be sealed with high temperature silicone or 

aluminum tape. The maximum height chimney 35 feet. Use a wall thimble for flammable wall or collar for cement 

wall. Seal the exterior chimney with silicone to create a vapor barrier. 

It is not recommended to seal the inner walls joints already containing a pre-installed silicone or rubber sealant 

by the manufacturer of the chimney. Do not use a perforated outer wall chimney flue channeling fresh air to the 

burner.

WARNING : DO NOT INSTALL IN SLEEPING ROOM           

CAUTION: THE STRUCTURAL INTEGRITY OF THE MANUFACTURED

          HOME FLOOR, WALL AND CEILING/ROOF MUST BE MAINTAINED 

Содержание RAFAEL 55

Страница 1: ...d dealer Manufactured by Paromax Inc 900 Mich le Bohec Suite 101 Blainville Qc Canada J7C 5E2 IMPORTANT INFORMATION Model Serial Number Purchase date Purchased from Please note your serial number when...

Страница 2: ...ur area Local regulations and requirements can supersede those specified in this manual if more stringent The authority having jurisdiction such as municipal building department fire department fire p...

Страница 3: ...L with corn or wheat Preparing the unit for corn or wheat Clinker prevention Controlling the fuel bed embers level How to measure the fuel bed height Pressure gauge setting Fuel consumption correction...

Страница 4: ...TE 3 7 6 CM 6 15 CM 8 20 CM 3 7 6 CM Stove ADJACENT WALL 30 76 2 CM MAX 4 10 CM 3 7 6 CM SEE NOTE S t o v e 6 15 CM 6 15 2 CM 6 15 2 CM 6 15 2 CM FRONT Stove NON COMBUSTIBLE FLOOR PROTECTION Report No...

Страница 5: ...s AC Europe with ground connection 15 It is strongly recommended to install a smoke detector and an ABC type fire extinguisher near the unit Using a power surge protector bar helps protect the electri...

Страница 6: ...talled If using an outside air supply the unit must be bolted to the floor See mobile home installation for more information Refer to Outside inlet Installation on page 8 The flooring under the stove...

Страница 7: ...ails Do not use a non approved pipe for your vent system i e Dryer vent B vent for gas vent PVC plastic pipe or single wall chimney system Please note that the length of a horizontal venting system sh...

Страница 8: ...y polarity inver sion that may damage the control panel see picture 35 on page 34 8 Installation A chimney installation with natural draft may create a malfunction due to high pres sure If necessary o...

Страница 9: ...the side of the base letter A and use metal spacer to adjust the lowest side And then level the front by placing the level on the front of the base B When burning agriculture fuel Paromax suggests inc...

Страница 10: ...anada Note Local codes or regulations may require different clearances Minimum Description A 24 61 cm Above lawns top of plants wood or any other combustible materials A 12 30 5 cm Above non combustib...

Страница 11: ...UFACTURER Refer to the norm CAN CSA B365 01 before installing the vent Equivalent Vent length EVL Venting your unit is crucial for optimum operation There are five different installation examples reco...

Страница 12: ...EVL Elevation above 3000 ft with an EVL of 7 must adapt to 4 inch vent pipe If your installation is below 3000 ft Rule of installation is to have the sum of the EVL 15 or less For a sum of more than...

Страница 13: ...nual feed will function between 3 to 4 minutes Make sure all doors are closed when the manual feed procedure is flashing Tabs 1 Is used to select the language Note Press the OK icon to accept your sel...

Страница 14: ...pressure gauge chapter and chart on page 20 To access ash removal settings Press on the trash icon bottom left to adjust the quantity of ash removed Press the green icon plus or minus to increase or d...

Страница 15: ...icon to activate or deactivate the mixing mode The X in the bottom box confirms that the mixing mode is activated The mixing mode can t be selected when the thermostat is activated See page 21 Note P...

Страница 16: ...ill the feed system and few pellets will drop into the burner Do not forget to validate the proper selected fuel type in the menu Caution It is impossible to change the fuel selection when the unit is...

Страница 17: ...to a minimum of 1 8 or 3 mm In case of ash fusion clinker increase the ash evacuation Close the air valve if the ash fusion persists Important Lightly tighten the top threaded disc with your hands whe...

Страница 18: ...is possibility of creating a clinker or a fuel overflow outside the burner it is recommend to empty the ash pan everyday when burning agricultural combustibles Install the 24 holes burner and close th...

Страница 19: ...the ash removal system at 15 A Gradually decrease the combustion fan of 1 level until the display shows number 4 B Gradually decrease the ash removal of 1 level until the display shows number 14 C Che...

Страница 20: ...y and can influence the flow Use the heat level 3 as a reference see chart Steps to follow Empty the hopper and fill it with 40 lbs or 18 2kg of fuel Before startup fill the measuring cup with wood pe...

Страница 21: ...r to the page 15 on tabs B to activate a thermostat when the unit is functioning Refer to page 13 on table 5 when unit is in standby mode How to program the fuel consumption on the control panel Resul...

Страница 22: ...rn pot see burn pot maintenance X Check the ash removal system X Empty ash pan X Check battery contacts and performance X Vacuum out the combustion chamber step 1 X Clean the burn pot jets X Clean the...

Страница 23: ...1 32 9mm 7 16 11mm and 9 16 14mm Allen keys of 1 8 3mm 5 32 4mm and 3 16 5mm Flathead screwdriver Phillips head screwdriver 2 star Pliers for retaining ring Hammer Drill and a 3 7 6cm round steel brus...

Страница 24: ...ot maintenance Image 7 Image 8 Image 9 Step 4 Before installing the burner it is necessary to clean the threads with a steel brush see image 10 and 11 WARNING PROTECT YOUR EYES WITH SAFETY GLASSES IF...

Страница 25: ...eel increases the pressure indicated on the gauge and reduce or eliminate any vibration caused by the accumulation of ash To remove the combustion fan Disconnect all A connectors see image 32 on page...

Страница 26: ...n the feed plate holder and slide out the feed auger screw Use pliers to take off the back retaining ring and replace the bushing Note Reinstall the vacuum switch holder and the ground wire connected...

Страница 27: ...ween the door and the unit image 25 If there s very little resistance when pulling the paper you may need to pinch the gasket with your fingers Repeat it in different locations around the doors If you...

Страница 28: ...he convection fan is defective Refer to chapter T6 T13 and T15 FUS 1 Feeding system fuse is burnt Replace the fuse 500 mA slow blow in socket F2 Refer to Chapter T7 FUS 2 Ash removal system fuse is bu...

Страница 29: ...mponents T2 Unit stops and displays THERMO 1 Thermo 2 is displayed on the screen Open the left door and remove the side panel see image 20 on page 26 and verify that the 2 green wires are connected to...

Страница 30: ...Always unplug the AC source wall outlet and DC source battery before replacing any fuses T9 The unit displays FUS 3 FUS 3 Replace the main fuse 500 MA fast acting in socket F1 see image 28 Remove the...

Страница 31: ...switch T12 Combustion fan problems No pressure could be related to a defective fan Verify the green wiring fan connection on controller A see image 32 Do a cold start and see if the flywheel is runnin...

Страница 32: ...mage 35 then lift up the box Replace the 5 amp fuse refer to image 36 Connect the unit to the AC source and verify that the green light and the screen are lit Replace the converter if the green light...

Страница 33: ...Power consumption on 120 volts AC Min 25 amps Max 65 amps Power consumption on 240 volts AC Europe Min 15 amps Max 35 amps Power consumption on 12 volts DC Min 1 8 amps Max 4 5 amps 12 8V Standby powe...

Страница 34: ...0F 20 Hopper switch Pressure switch green pin 6 yellow pin 7 yellow pin 8 yellow pin 9 yellow pin 10 Controller A Motor output 0 to 10V input 12V input Fan A red pin 11 brown pin 12 black pin 13 Contr...

Страница 35: ...0F 20 Hopper switch Pressure switch green pin 6 yellow pin 7 yellow pin 8 yellow pin 9 yellow pin 10 Controller A Motor output 0 to 10V input 12V input Fan A red pin 11 brown pin 12 black pin 13 Contr...

Страница 36: ...an SN Tech RA 10 530 Convection plastic flywheel RA 10 550 Speed control for combustion or convection fan RA 10 520 Burner 7 threads for Wood Pellet RA 10 580 Burner 7 threads for Corn and Wheat RA 10...

Страница 37: ...y moment PAROMAX will not be held responsible for any consequential damage whose cost exceeds the original price of the device PAROMAX is under no obligation to improve or modify an already manufactur...

Отзывы: