●Use the bundled power cord (AC 100 - 240 V specifications).
Deviation could lead to electric shock, malfunction, and/or equipment
failure.
●Unplug the power cord in case of equipment failure.
Deviation, such as keeping connected for a long time, could lead to
fire.
●Connect this Switching Hub to ground.
Deviation could lead to electric shock, malfunction, and/or equipment
failure.
●Connect the power cord firmly to the power port.
Deviation could lead to electric shock, and/or malfunction.
●Unplug the power plug if the STATUS LED blinks in orange (system
fault).
Deviation, such as keeping connected for a long time, could lead to
fire.
●Handle the Switching Hub carefully so that fingers or hands may
not be damaged by twisted pair ports, SFP extension slots, console
port, SD card slot, or power cord hook block.
8
Содержание ZEQUO 2200
Страница 3: ...3 ...
Страница 86: ...7 ARP Commands 86 ...
Страница 93: ...9 Auto Configuration Commands 93 ...
Страница 273: ...30 IPv6 NDP Commands 273 ...
Страница 330: ...36 LLDP Commands 330 ...
Страница 361: ...39 MAC based Access Control Commands 361 ...
Страница 435: ...45 Network Monitoring Commands 435 Zxxx0 admin clear attack_log Command clear attack_log Success Zxxx0 admin ...
Страница 461: ...49 Protocol VLAN Commands 461 ...
Страница 483: ...50 QoS Commands 483 ...
Страница 504: ...53 SNMPv1 v2 v3 Commands 504 Only Administrator level users can issue this command ...
Страница 523: ...53 SNMPv1 v2 v3 Commands 523 ...
Страница 562: ...57 Subnet VLAN Commands 562 ...