ELC500 Control unit
105
■
Fixed-time demand (Average power method)
This is the method of monitor and control by estimation demand value from the ratio of the demand value
increased from the start time to elapsed time.
It monitors every 1-min. When the estimated demand, calculated from average power for the elapsed
time, exceeds the target value, it output alarm in 3 stages.
According to the alarm level, you can control equipment power consumption such as air conditioner, and
depress peak power.
<Calculation formula> N (min): period
Present demand = Integral power from the start to elapsed time x (60/ N (min))
Estimated demand = Present demand / Elapsed time x N (min)
Adjustment demand = Estimated demand – Target demand
<Alarm example 1>
Present demand is under Reference demand.
→
No alarm
<Alarm example 2>
Present demand is over Reference demand
→
Alarm 1
Содержание ELC500
Страница 1: ......
Страница 18: ...ELC500 Control unit 10 Point Using FPWIN PRO7 you can check the cunsumption current ...
Страница 206: ...ELC500 Control unit 198 Dimensions and Others Chapter 12 Dimensions 12 1 Unit mm ...
Страница 207: ...ELC500 Control unit Revision History Issue Date Manual no Content of revision September 2018 WUME ELC5 01 First edition ...
Страница 208: ... ...