Fill out the blanks below with information about the link under test. This information will help you plan out the
key information about the link, and will be used to enter the link setup information in the Fiber OWL 7 certifier.
LINK PLANNING WORKSHEET
Meter End:
Injector End:
LINK CONFIGURATION INFORMATION
METER
TEST
ZERO
UNITS
SAVE
INJECTOR
Project Name:
Location:
PROJECT INFORMATION
Is Encircled Flux compliant testing required? YES NO
ENCIRCLED FLUX COMPLIANCE (
MULTIMODE TESTING ONLY
)
Fiber Pair Geometry: STRAIGHT CROSSED
Number Fiber Pairs By: STRAND PAIR
FIBER PAIR SETTINGS (
PAIR/BIDI MODES ONLY
)
Fiber Group Name:
Starting Fiber Number:
RUN NAME SETTINGS
Fiber Type:
Connections:
*Length(m):
Standard:
Test Mode:
Reference Method:
PAIR BIDI CERT LOSS
-jumper
Splices:
* for manual length entry in CERT mode only
PAIR/BIDI – use FO7 INJECTOR
CERT/LOSS – use standalone light source
61
Содержание 7 LITE Series
Страница 3: ...3 This page intentionally left blank ...