45
Chimney Shroud
Top Open
Keep a minimum
6-inch
clearance around the diameter of the cap’s side edge and extending above and below the cap.
Sides Open
Keep a minimum
6-inch
clearance around the diameter of the cap’s side edge, and a minimum
10-inch
clearance above the top of
the cap. For openings in the shroud, make sure to allow for enough air flow space to release the exhaust gases and allow the vent
to operate properly.
Содержание Clear 130 LS
Страница 25: ...25 Air Intake for a Platform NOTE Please refer to the Platform section for details on platform construction...
Страница 53: ...53 Wiring Diagram Screen Fireplace with Interior Lighting...
Страница 54: ...54 Wiring Diagram Screen Fireplace with Interior Lighting and Ortal Power Vent...
Страница 55: ...55 Wiring Diagram Double Glass Fireplace...
Страница 56: ...56 Wiring Diagram Double Glass Fireplace with Interior Lighting...
Страница 57: ...57 Wiring Diagram Double Glass Fireplace with Interior Lighting and Ortal Power Vent...
Страница 58: ...58 Carbon Monoxide Detector Wiring Diagrams CO Kit Wiring Diagram Screen Fireplace...
Страница 59: ...59 CO Kit Wiring Diagram Double Glass Fireplace...