![ORTAL Clear 130 LS Скачать руководство пользователя страница 32](http://html1.mh-extra.com/html/ortal/clear-130-ls/clear-130-ls_installation-and-operation-manual_1654324032.webp)
32
Finishing
The following diagrams show various finish applications.
Diagrams apply to both combustible and non-combustible finish
material.
IMPORTANT NOTES:
All recessed installations must comply with applicable maximum overhang limit and side wall clearances. See “Maximum
Overhang Depth” and “Clearance to a Side Wall” sections for details.
No material is permitted to extend past the metal lip surrounding the fireplace viewing area. This area must be unobstructed
to allow the heat barrier and inside glass panel to be removable.
MANUFACTURED STONE: A minimum 2-inch recess is suggested. Consult stone manufacturer for clearance
requirements.
5
/
8
” DensGlass® Fireguard® Sheathing is an approved
5
/
8
” Type X Drywall equivalent. This may be necessary for use with
heavier finishes.
WARNING: Wood finish or floor/hearth extension may dry out, crack, warp or become discolored over time. Consult
with floor manufacturer for required clearances to a heat source.
Flush Installation
Diagram applies to both combustible and non-combustible finish material.
Содержание Clear 130 LS
Страница 25: ...25 Air Intake for a Platform NOTE Please refer to the Platform section for details on platform construction...
Страница 53: ...53 Wiring Diagram Screen Fireplace with Interior Lighting...
Страница 54: ...54 Wiring Diagram Screen Fireplace with Interior Lighting and Ortal Power Vent...
Страница 55: ...55 Wiring Diagram Double Glass Fireplace...
Страница 56: ...56 Wiring Diagram Double Glass Fireplace with Interior Lighting...
Страница 57: ...57 Wiring Diagram Double Glass Fireplace with Interior Lighting and Ortal Power Vent...
Страница 58: ...58 Carbon Monoxide Detector Wiring Diagrams CO Kit Wiring Diagram Screen Fireplace...
Страница 59: ...59 CO Kit Wiring Diagram Double Glass Fireplace...