b. Lock the server module into the chassis. Rotate the top ejector down while rotating the
bottom ejector up until they both latch into place (see 2).
The server module is now locked in the chassis. After you install a server module into a
powered-on chassis, the server module SP automatically boots using standby power from
the chassis power supplies.
Verify server module status indicator LED activity.
Verify that the server module front panel indicators illuminate after plugging in the server
module:
a. All four server module status indicators blink three times.
The blade has been powered on and the SP boot process has begun.
b. The green OK/Power status indicator blinks rapidly (0.125 seconds on, 0.125 seconds off)
while the SP is booting.
6
3. Insert the Server Module Into a Chassis
35
Содержание X4-2B
Страница 1: ...Sun Blade X4 2B Installation Guide Part No E37036 04 March 2014 ...
Страница 8: ...8 ...
Страница 24: ...24 ...
Страница 47: ...Click Log In The System Summary page appears 5 Determining Server Module Oracle ILOM SP IP Address 47 ...
Страница 110: ...110 ...
Страница 118: ...118 ...