Oracle Field Service
Using Core Application
Chapter 2
Dispatcher Activities
Field name
Action
the Time Slot Start and Time Slot End fields. All day is available only for the activities
that belong to activity types for which you have deselected the Support of time slot
option.
6.
Click OK.
‘Position In Route’ in an Activity Lifecycle
The Position in Route field is displayed on several pages and it is consistent throughout the activity lifecycle.
These points define the logic for the way the Position in Route field is displayed:
•
The Position in Route field is applicable to all scheduled ordered activities (pending, started, completed, not
done, and suspended), except for canceled activities. If in a route there are some completed activities, the
started activities could have a higher value for Position in Route than the first activity.
•
Not Scheduled Ordered, Not Scheduled Not Ordered, and Scheduled Not Ordered activities don't have a
defined position in the route.
•
Setting of order for Not Scheduled activities makes sense only to define the order of the activities, before they
are scheduled.
•
The behavior of the Position in Route field for activities that are on a bucket is same as the behavior of the
Position in Route field for non-scheduled activities.
•
The sequence of activities is consistent throughout all activity statuses.
•
Activities in started, complete, and not done statuses display the Position in Route field as a number.
These points describe how the Position in Route field works:
•
You can change the value for Position in Route depending on the constraints of these settings:
◦
"Support of not-ordered activities" option on the Add Activity type page.
◦
"Allow activity reorder inside the route" option on the User Types (Activity Management section) page.
◦
"Allow selection of the next activity on Complete" option on the User Types (Activity Management
section) page.
•
You don’t see the "Not Ordered" option, if "Support of not-ordered activities" is not selected on the Add Activity
type page.
•
You can change the order, if you have selected "Allow selection of the next activity on Complete" on the User
Types (Activity Management section) page, but only by filling the "Next activity" field on the Complete page.
•
You can change the value of Position in Route, if these conditions are satisfied:
◦
The visibility of the field on User Types is read-write or mandatory.
◦
"Allow activity reorder inside the route" is selected on the User Types page.
◦
The activity status is Pending.
•
You cannot change the value of Position in Route, if these conditions are true:
◦
The visibility of the field on User Types is read-only.
◦
"Allow activity reorder inside the route" is not selected on the User Types page.
◦
Activity is in the final state (started, completed, not done, suspended, cancelled status).
50
Содержание 21C
Страница 1: ...Oracle Field Service Using Core Application 21C ...
Страница 4: ...Oracle Field Service Using Core Application Inventory 245 Resources 252 End Your Day 263 ...
Страница 6: ...Oracle Field Service Using Core Application Preface ii ...
Страница 18: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 12 ...
Страница 73: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 67 ...
Страница 75: ...Oracle Field Service Using Core Application Chapter 2 Dispatcher Activities 69 ...
Страница 187: ...Oracle Field Service Using Core Application Chapter 3 Field Resource Activities 181 ...
Страница 204: ...Oracle Field Service Using Core Application Chapter 3 Field Resource Activities 198 ...
Страница 274: ...Oracle Field Service Using Core Application Revision History 268 ...