Check the inside of the chiller and the piping system for leakage or loose connections.
10)
Move the motor protection switches “MTC” and “MTP” to position “1”.
11)
Lock the switch cabinet with the key.
12)
Move the main switch of the chiller to position “1” (the temperature of the cooling medium appears on the
display).
Never touch any part of the cooling medium circuit when the chiller is running!
13)
Start up the chiller by pressing the
button (LED lights up).
14)
Because the pump starts up immediately, make sure that the direction of rotation for the pump matches the
direction of the arrow on the casing. If it is rotating in the opposite direction, turn off the main switch of the
chiller immediately and arrange for the polarity of the chiller to be reversed.
Do not carry out any work inside the chiller if the main switch is in the “ON” position!
15)
Make sure that the water is able to circulate adequately.
16)
Check whether the pressure shown is within the limits specified for the pump. If not, take appropriate action
to ensure that pump is running within the specified limits.
17)
Stop the chiller by pressing the
button (LED no longer lights up).
18)
Check the inside of the chiller and the piping system for leakage or loose connections.
19)
Fill the tank up to the maximum.
20)
Fasten the tank cap afterwards.
21)
Fit the two side panels back onto the casing.
22)
Start up the chiller by pressing the
button (LED lights up).
23)
Wait for the compressor to switch on. The compressor symbol will appear on the display (see Section 6.4).
24)
Wait until the chiller has attained the operating conditions. This is indicated when the actual temperature
shown in the display matches the preset target temperature.
25)
Check the preset target value. The chiller is normally factory-set to the temperature required by the custom-
er.
26)
When the chiller is within the operating conditions set by the manufacturer, check whether the current uptake
of the chiller agrees with the data indicated on the identification plate and with those contained in the table in
the supplement.
6.2
CHECKLIST FOR STARTING UP OIL RECIRCULATING CHILLERS
After turning off the main switch for more than 1 hour or after extraordinary maintenance work, each
chiller start should be regarded as an initial start-up.
The initial start-up calls for a number additional checks to ensure safe and reliable performance of the
system.
OIL REQUIREMENTS
Quality:
The oil used for filling the chiller should have a viscosity index in accordance with the standards indicated
in the following table.
CHO Series
Tank close to the chiller (max. 2m)
Gear pump (option) with remote tank
(>2m)
Oil/
Outlet temperature
≤
ISO32/
min. +20°C
≤
ISO46/
min. +25°C
≤
ISO68/
min. +30°C
ISO10
÷
ISO68
General operating conditions:
The oil recirculating chiller is designed for cooling medium temperatures of +20°C to +30°C. If the tem-
perature values deviate from these, please contact the manufacturer.
Conditions during commissioning:
The use of oil with a higher viscosity and lower cooling temperatures may cause overloading of the circu-
lation pump. If this is the case, the cooling medium circuit must be adapted accordingly. In such cases,
contact the manufacturer.
CHECKLISTE FOR CHO 29 TO CHO 149
Controller Type “B”, see 6.4 (CHO 29 to CHO 149)
1)
Remove the front plate and the two side panels.
2)
Connect the supply devices or the external tank. Make sure that the level of the contents is higher than the
pump to support the automatic priming system. Use a T-fitting if necessary for filling (refer to Fig. 1, Point
5.2.1). One essential requirement is the availability of a suitable vent opening for the system, particularly for
chillers with gear pumps.
3)
Open the filler screw on the pump head.
4)
Tighten the screw again when only oil flows out.
5)
Open the shut-off valve.
6)
Open the switch cabinet with the key supplied (Fastened to the main switch when the chiller is delivered).
Содержание CHG 08
Страница 39: ...710 1760 00 04 05 22 05 2014 39 1 1 1 CHW CHO CHG chiller CHW CHO CHG 1 2 CHW CHO CHG CHW CHO CHG CHW CHO CHG 2...
Страница 40: ...710 1760 00 04 05 22 05 2014 40 CHW 20 25 CHO 10 cST CHG 20 25 5 EN 60204 EN 378 2...
Страница 41: ...710 1760 00 04 05 22 05 2014 41 HFC CE 842 2006 3 3 1 3 2 C CND EVA HP LP...
Страница 42: ...710 1760 00 04 05 22 05 2014 42 MHP MLP PV R V a 2 5 b VE 2 5 MOP IAF 3 3 MF P...
Страница 43: ...710 1760 00 04 05 22 05 2014 43 BP BPM CAA EV 1 1 VNR FL LVE RA TD VNR EV 1 2 3...
Страница 44: ...710 1760 00 04 05 22 05 2014 44 1 2 3 4 5 6 7 3 4 ALR...
Страница 48: ...710 1760 00 04 05 22 05 2014 48 CHW 97 CHW 3652 4 2 4 3 5 50 C 12 6 5 2 5 5 1 2 C 40 C 2 C 40 C...
Страница 50: ...710 1760 00 04 05 22 05 2014 50 25 1 60 CHO A B C D E Abb 1 TN C 230 1 1 N PE AC 400 3 3 PEN AC PEN...
Страница 65: ...710 1760 00 04 05 22 05 2014 65 CHW 682 CHW 3652 CHG 225 CHG 365 6 4 1 2 0 0 5 2 1...
Страница 67: ...710 1760 00 04 05 22 05 2014 67 5 6 8 9 10 3 20 15...
Страница 68: ...710 1760 00 04 05 22 05 2014 68 9 1 A CHW 11 CHW 36 CHG 08 1 OFF A OFF LA2 P1 SL HA 2 A 3 LA2 2 A CA 4 HA A...