INST
ALLA
TION
UT-MT-0812_2.0_24-01-2023 (EN)
Use and Maintenance Manual
LERA
18
Slightly screw the cable clip nut: perform a single turn to secure the cable in position and insert the conductors in
the terminals 1 (small PIN), 2 (big PIN). Cut off the part of the conductors in excess at the terminal.
Make the earth connection: connect the conductor to the ground screw located on the lower part of the body.
Pass the cable through the support and insert it into the bulkhead coupling, observing the numbering on the joint.
Using the open hexagonal key (not included) completely tighten the cable clip nut with the indicated tightening torque.
Reassemble the support. Tighten the screws with the indicated tightening torque.