INST
ALLA
TION
UT-MT-0812_2.0_24-01-2023 (EN)
Use and Maintenance Manual
LERA
21
If foreseen, screw and tighten the frangible coupling to the base.
Insert inside the coupling the cable of the secondary of the transformer (with socket) and
the ground cable (ground connected inside the base).
Make the electrical connections: insert the plug of the fixture in the socket coming from the transformer and joint
the ground cable with the protective conductor coming from the base.
Insert the pole on the coupling and tighten the locking screws (respecting the verticality of the pole).