![OBO Bettermann EI30 Скачать руководство пользователя страница 41](http://html1.mh-extra.com/html/obo-bettermann/ei30/ei30_mounting-instructions_3169658041.webp)
41 | EN
Mounting instructions, PYROLINE
®
Con PLC fire protection duct
Mounting PYROLINE® Con S PLC with a support system
8 4
Mounting the duct trough
≤ 1
00 mm
≤ 1
00 mm
≤ 1
00 mm
1
2
Fig 34:
Spacings of suspension points and joints
1. Apply sealing strips
1
to both ends of the duct trough.
2. Locate the duct trough from the wall or wall penetration in such a way
that the front side has a maximum distance of 100 mm to the support
surface of the bracket or the support rail. With a wall connection, en-
sure a joint of maximum 3 mm
2
.
Содержание EI30
Страница 63: ...EN 63 Notes...