![OBO Bettermann EI30 Скачать руководство пользователя страница 38](http://html1.mh-extra.com/html/obo-bettermann/ei30/ei30_mounting-instructions_3169658038.webp)
38 | EN
OBO Bettermann
Mounting PYROLINE® Con S PLC with a support system
8 1
Mounting the wall bracket
≤ 1000 mm
≤ 700 mm
≤ 200 m
m
Fig 31:
Wall bracket mounting
1. Have the right wall bracket to hand. The wall bracket must be suf-
ficiently long for the fire protection duct to be supported over its full
area.
2. Draw the drill holes for the wall brackets:
– A maximum of 200 mm away from the wall for the first wall
bracket.
– 900 mm away from the wall for the second wall bracket.
– 1,000 mm spacing between all further wall brackets.
Note!
The data relates to a complete duct length. If the fire protection duct is
shortened, adjust the spacing of the second wall bracket accordingly.
3. Drill the drill holes.
4. Mount the wall bracket with bolt ties for masonry and concrete.
Содержание EI30
Страница 63: ...EN 63 Notes...