Figure 9. Rack-mount, 2-post, 23"
4.1.3.3. Shelf-Mount
For shelf installations (i.e. using the NUVP-SSG-SB)
1. Install the brackets on the Stack Switchgear.
2. Place the Stack Switchgear on the shelf at the desired location.
3. Attach the Stack Switchgear (with brackets installed) to the shelf.
Figure 10. Shelf-mount
Nuvation Energy High-Voltage BMS - Product Manual
Document ID: NE-PM-003
14
Rev 1.2, 2021-03-03
Curie Update 1