![NuAire NU-5710 Скачать руководство пользователя страница 47](http://html.mh-extra.com/html/nuaire/nu-5710/nu-5710_operation-and-maintenance-manual_1715661047.webp)
OM0249
Page 47 of 64
Rev 4 June/2020
PREPARATION
Following the prompts in the incubator display screen you will:
•
Remove culture cells, samples, dishes, instruments, or other user-introduced equipment from the chamber.
•
Wipe out all spills and materials from chamber walls, shelves, and plenums using a disinfectant of choice that is
compatible with construction of the Incubator chamber and instrumentation.
•
Ensure the hole in the access port plug at the side of the Incubator is open.
This is a relief for the chamber during the Decon Cycle.
•
Ensure that the sample port in the front panel of the Incubator is capped.
Condensation can form in tubing if it is left open.
•
Models NU-5720 and NU-5741 remove the RH sensor from upper left side of the back wall of the chamber. The
sensor will be damaged if it is not removed. The sensor cable is made to withstand the heat of a decon cycle
and is left in place.
•
Empty water pan then clean it with a disinfectant then, fill with 300ml of water. Place it back in the chamber on
the highest shelf for the decon cycle.
FOLLOW ALL FEDERAL, STATE AND LOCAL REGULATIONS THAT APPLY
TO THE DISINFECTANT USED TO CLEAN THE CHAMBER.
Note:
•
CO
2,
RH and O₂ systems will be idle during the cycle.
•
Protection of the CO
2
and
O₂ sensors
during the heated cycle is automatic.
•
RH sensor must be removed from all models equipped with RH control the as stated in the Preparation section
and in the NuTouch screen prompts that show during the startup of the cycle. The sensor will be damaged if it is
not removed.
•
The Decon Cycle will not advance to the heat up phase unless the door is opened so that the NuTouch screen
prompts to empty the water pan, clean the chamber and remove the RH sensor are followed.
•
Follow the on screen instructions, pressing the Next button when each step is completed
!
HUMIDIFIED 95 DEG. C DECON CYCLE
37
95
0:
00:
00
1:
00:
00
2:
00:
00
3:
00:
00
4:
00:
00
5:
00:
00
6:
00:
00
7:
00:
00
8:
00:
00
9:
00:
00
10:
00:
00
11:
00:
00
12:
00:
00
13:
00:
00
14:
00:
00
TIME (HR:MN:SEC)
TE
M
PE
RA
TURE
DE
G
. C /
RH %
TEMPERATURE
RELATIVE HUMIDITY
Decon Phase
Drying Phase
Содержание NU-5710
Страница 9: ...OM0249 Page 9 of 64 Rev 4 June 2020 ...
Страница 13: ...OM0249 Page 13 of 64 Rev 4 June 2020 ...
Страница 24: ...OM0249 Page 24 of 64 Rev 4 June 2020 ...
Страница 26: ...OM0249 Page 26 of 64 Rev 4 June 2020 ...
Страница 58: ...OM0249 Page 58 of 64 Rev 4 June 2020 ...
Страница 59: ...OM0249 Page 59 of 64 Rev 4 June 2020 ...
Страница 60: ...OM0249 Page 60 of 64 Rev 4 June 2020 ...
Страница 61: ...OM0249 Page 61 of 64 Rev 4 June 2020 ...
Страница 62: ...OM0249 Page 62 of 64 Rev 4 June 2020 ...
Страница 63: ...OM0249 Page 63 of 64 Rev 4 June 2020 ...
Страница 64: ...OM0249 Page 64 of 64 Rev 4 June 2020 ...