- 36 -
INSTALLATION INSTRUCTIONS
G025
For NPK 2,500 to 15,000 ft. lb. class hammers
b. Install straight fittings (g19) into the special elbows (a88).
c. Install special elbows (a88a and a88b) into the joint fittings (a18a and a18b).
Reconnect the hammer hoses (m5 and m6).
d. Install hydraulic hose (a64). Route hose from return side joint fitting (m18b),
through top bracket burnout, to port labeled “R
OIL
” on the grease pump (FZ).
Содержание G015
Страница 8: ...7 GREASE PUMP ASSEMBLY G015 MOUNTING SPECIFICATIONS G025 MOUNTING SPECIFICATIONS...
Страница 57: ...56 WARRANTY STATEMENTS...
Страница 58: ...57 WARRANTY STATEMENTS...
Страница 59: ...58 WARRANTY STATEMENTS...
Страница 60: ...Copyright 2019 NPK Construction Equipment Inc www npkce com G025 9600g Hammer Mounted Auto Lube System 11 19...