- 44 -
GREASE CARTRIDGES
CHANGING THE GREASE CARTRIDGE (G015)
1. Remove the old grease cartridge.
2. Before installing the grease cartridge (a54), make sure the flat seal (a65) is present
and not damaged. If the flat seal is missing or damaged, see
“CHANGING THE
FLAT SEAL”
.
3. Inspect the lubricant passage for contamination.
4. Apply a light coat of grease to the o-ring (RR) located in the pump housing (a59),
then install.
5. To accelerate priming, first remove the cap from the cartridge opening. Then, using
the cartridge follower piston (a66), press the grease (
28
) out 3/16” – 3/8” (
5 – 10 mm
).
6. Next, insert the cartridge into the pump housing by pressing it slightly then threading
it in by hand.
DO NOT OVERTIGHTEN!
Содержание G015
Страница 8: ...7 GREASE PUMP ASSEMBLY G015 MOUNTING SPECIFICATIONS G025 MOUNTING SPECIFICATIONS...
Страница 57: ...56 WARRANTY STATEMENTS...
Страница 58: ...57 WARRANTY STATEMENTS...
Страница 59: ...58 WARRANTY STATEMENTS...
Страница 60: ...Copyright 2019 NPK Construction Equipment Inc www npkce com G025 9600g Hammer Mounted Auto Lube System 11 19...