- 25 -
INSTALLATION INSTRUCTIONS
G015
For NPK 2000 ft. lb. class hammers (with top brackets that include joint fittings).
1. The grease pump should be mounted
so that the grease cartridge (a54) is in
the vertical position when the hammer
is in operation.
It must be ensured
that neither dirt nor any other type of
contamination may fall into the intake
area below the cartridge when the
cartridge is being re-filled.
2. Remove the existing adapter fittings
from the grease pump assembly.
Install one ORFS adapter fitting (g19),
NPK part number L1213-6600, into
the port labeled “P
OIL
” (
126
) and one
check valve (k3b), NPK part number
G025-6300 into port “R
OIL
” (
127
).
Install one check valve (k3a), NPK
part number G100-6300, and one
swivel elbow (g24), NPK part number
K023-6650 into the port labeled
“P
GREASE
” (
18
).
3. Remove the hammer (KK) from its
bracket (LL).
Содержание G015
Страница 8: ...7 GREASE PUMP ASSEMBLY G015 MOUNTING SPECIFICATIONS G025 MOUNTING SPECIFICATIONS...
Страница 57: ...56 WARRANTY STATEMENTS...
Страница 58: ...57 WARRANTY STATEMENTS...
Страница 59: ...58 WARRANTY STATEMENTS...
Страница 60: ...Copyright 2019 NPK Construction Equipment Inc www npkce com G025 9600g Hammer Mounted Auto Lube System 11 19...