- 28 -
INSTALLATION INSTRUCTIONS
G015
For NPK 2000 ft. lb. class hammers
(with top brackets that include joint fittings).
e. Install hose line (a63). Route hose from pressure side joint fitting (m18a),
through top bracket burnout, to port labeled “P
OIL
” on the grease pump (FZ).
5.2.
For units with NPT style joint fittings.
a. Disconnect the hammer hoses (m5 and m6) from the NPT elbows (m37a
and m37b). Remove the elbows from the joint fittings and discard.
b. Install straight fittings (g19) into the special elbows (a88).
Содержание G015
Страница 8: ...7 GREASE PUMP ASSEMBLY G015 MOUNTING SPECIFICATIONS G025 MOUNTING SPECIFICATIONS...
Страница 57: ...56 WARRANTY STATEMENTS...
Страница 58: ...57 WARRANTY STATEMENTS...
Страница 59: ...58 WARRANTY STATEMENTS...
Страница 60: ...Copyright 2019 NPK Construction Equipment Inc www npkce com G025 9600g Hammer Mounted Auto Lube System 11 19...