- 23 -
INSTALLATION INSTRUCTIONS
G015
For NPK 500 to 1300 ft. lb. class hammers (
with swivel hammer port connections
).
4. Weld the mounting plate (a28) and
drill the access hole in the hammer
bracket according to the “
Bracket
Modification
” instructions supplied by
NPK. Drill and tap hole in the bracket
support block per instructions. For
additional information, contact the
NPK Service Department at 1-800-
225-4379. Re-install the hammer into
the bracket. Bolt the grease pump
(FZ) to its mounting plate using the
two hex head cap screws (AF1), NPK
part number G025-4530 and washers
(U), NPK part number G025-4700.
Using high strength thread adhesive,
torque the hex head cap screws to 80
ft. lbs. (
110Nm
).
NOTE:
Washers (G025-4700) must
be installed per fig. 1.
(Ref “a” and “b” angles)
5. Install swivel bulkhead tees onto the
existing port fittings on the hammer
inlet (
6
) and outlet (
5
) ports. Install
the bulkhead mounting bracket (a52)
onto the bulkhead tees (a85) then
orient the assembly so the swivel
fittings are pointing towards the
hammer gas head. Mark locations for
the bulkhead mounting plate bolt
holes. Drill holes in the marked
locations. Bolt the bulkhead mounting
plate to the side plates of the hammer
bracket using the nuts (m12), bolts
(AF) and washers (U) provided.
Install reducing fittings (a86) onto the
swivel tees.
Содержание G015
Страница 8: ...7 GREASE PUMP ASSEMBLY G015 MOUNTING SPECIFICATIONS G025 MOUNTING SPECIFICATIONS...
Страница 57: ...56 WARRANTY STATEMENTS...
Страница 58: ...57 WARRANTY STATEMENTS...
Страница 59: ...58 WARRANTY STATEMENTS...
Страница 60: ...Copyright 2019 NPK Construction Equipment Inc www npkce com G025 9600g Hammer Mounted Auto Lube System 11 19...