![Norsup 7027993 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/norsup/7027993/7027993_original-manual_1705743009.webp)
16
17
Alterations which serve the technological progress as well as errors excepted!
ORIGINAL MANUAL
NORSUP
WWW.NORSUP.EU
Alterations which serve the technological progress as well as errors excepted!
SALT CHLORINATOR
SALT CHLORINATOR
EN
ES
FR
IT
DE
PT
7.10. INSTALLING THE LINE CELL
1) If pipe
A
has an outer diameter of 50 mm, cut the
pipe to a length of 248 mm.
If pipe
A
has an outer diameter of 63 mm, cut the
pipe to a length of 232 mm.
2) Fully disassemble the cell following the above
exploded diagram.
3) Rub down all bonding surfaces with sand
paper: pipes
A
, reducers
C
, collars
D
.
4) Slide each nut
B
onto the end of each
pipe
A
.
5) Glue together each set of [pipe
A
-
reducer
C
- collar
D
].
6) Wait for the glue to dry completely.
7) Place each seal
E
inside each collar
D
.
8) Attach cell
F
with the 2 nuts
B
.
7.11. INSTALLATION OF THE T-CELL
1) Fully disassemble the cell following the exploded
diagram above.
2) Rub down all bonding surfaces with sand paper:
pipes
A
, reducers
B
, sleeve
C
.
3) Glue together the unit comprising
[pipes
A
- reducers
B
- sleeve
C
].
4) Wait for the glue to dry completely.
5) Place seal
D
all the way into electrode
E
.
6) Slide electrode
E
into sleeve
C
, with the plates of
the electrode aligned as in the above diagram.
7) Screw nut
F
onto sleeve
C
.
3) Prepare the 2 connectors
17-A
and
17-B
following
the direction of assembly of the parts shown below.
4) Mount the 2 connectors
17-A
/
17-B
and the 2 valves
22
in the 2 saddle clamps
8
in accordance with the
image shown opposite, using Teflon tape.
5) Fix measuring chamber
6
to the wall using the
screws and plastic anchors provided.
6) Connect measuring chamber
6
to the 2 connectors
17-A
and
17-B
, with the semi-flexible tubing
21
cut
to the right size.
7) Remove the
storage vial from ORP probe
19
.
8) Loosen nut
A
(see the image shown opposite)
without removing it.
9) Insert the probe
19
into the measuring chamber
6
as in the photo below.
10) Tighten nut
A
by hand.
ATTENTION
Respect the direction of the arrow engraved on
each fitting.
ATTENTION
Do not invert the connectors
17-A
and
17-B
during assembly: observe the installation
diagram shown on the previous page,
following the direction of the water flow.
ATTENTION
Screw on and tighten nuts
B
by hand.
ATTENTION
Tighten nut
F
by hand.