Maintenance
5-12
P/N 7146386A
E
2008 Nordson Corporation
VBN w/o Control System
Pressure Control Valve
(contd.)
Installing Service Kit
Each kit contains two O-rings and high-temperature grease.
Fig. 5-11
Mechanical pressure control valve
Pneumatic pressure control valve (option)
Service kit P/N: 394600
Service kit P/N: 394600
Required tools:
Open-end wrench, size 24
Pliers
Torque wrench
Required tools:
Open-end wrench, size 27
Pliers
Torque wrench
1.
Heat melter to operating temperature.
WARNING:
Hot! Risk of burns. Wear appropriate protective
clothing/equipment.
2.
Relieve melter pressure.
−
3.
Close compressed air supply.
4.
Refer to
Measuring Insertion
Depth
4.
Unscrew air hose.
5.
Use an open-end wrench to screw out the pressure control valve, then
extract with a pliers.
If the tank is not empty:
Collect any adhesive that may escape (bowl).
Quickly screw in a replacement pressure control valve or a plug, then perform
maintenance work.
6.
Remove old O-rings and disassemble and clean pressure control valve.
Refer to section
Parts
for detailed drawing. of the valve
NOTE:
Disassemble valve only when warm.
7.
Install new O-rings. Apply grease to all threads and O-rings.
8.
Guide pressure control valve into the hole when the melter is warm and
tighten with torque wrench.
Torque: 15 Nm (133 lbin)
9.
Refer to
Adjusting Setting Screw
9.
Attach air hose.
−
10. Open compressed air supply
again.
Содержание VersaBlue 100H/100H
Страница 46: ...Installation 3 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Страница 74: ...Maintenance 5 24 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Страница 94: ...Repair 7 14 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...
Страница 96: ...Parts 8 2 P N 7146386A E 2008 Nordson Corporation VBN w o Control System...