4
Applications
74
Field Station NPL-632 Instruction Manual
The observation screen for the first stake (from
the instrument) appears.
4.
Sight the prism and then press
[MSR1]
or
[MSR2]
.
5.
Use
[^]
or
[v]
to change the guide point. You can
calculate and guide up to double the number of
the stakes.
6.
To record the point as an SO record, press
[ENT]
.
RefLine S-O
This function allows you to stake out a point based on the Sta, O/S, and dZ to a
specified line.
1.
Press
[4]
or select
RefLine S-O
in the Stakeout menu.
2.
Enter the first point (P1) of the line.
For example, if you measure to the end point at 100 m from the instrument and set the span total to 2, the
following four points are calculated and can be staked:
<1/2>
HD
<2/2>
<3/2>
<4/2>
50 m
100 m
150 m
200 m
Содержание NPL-632
Страница 1: ...Version A1 1 0 May 2006 Field Station NPL 632 Instruction Manual ...
Страница 8: ...Contents viii Field Station NPL 632 Instruction Manual ...
Страница 14: ...Safety 16 Field Station NPL 632 Instruction Manual ...
Страница 110: ...4 Applications 96 Field Station NPL 632 Instruction Manual ...
Страница 168: ...6 Checking and Adjustment 154 Field Station NPL 632 Instruction Manual ...
Страница 177: ...C H A P T E R 8 Field Station NPL 632 Instruction Manual 163 System Diagrams 8 In this chapter Q System Components ...
Страница 180: ...8 System Diagrams 166 Field Station NPL 632 Instruction Manual ...
Страница 196: ...9 Communications 182 Field Station NPL 632 Instruction Manual ...
Страница 206: ...10 Error Messages 192 Field Station NPL 632 Instruction Manual ...