5 - TRANSPORT OPERATIONS
1. Connect all slings to a single point
(1)
on the suitable
craning equipment above the cab.
2. Attach chains to the machine’s rear lifting points
(2)
on
the machine.
RAIL14SSL0402BA
17
3. Route the front sling down the right-hand side of the
Roll Over Protective Structure (ROPS).
RAIL14SSL0401BA
18
4. Route the front sling down the outside of the ROPS
front pivot point
(1)
and attach to the machine’s right-
hand side lifting point
(2)
.
5. Repeat on the left-hand side of the machine.
6. Clear the area.
7. Lift the machine just off the ground. The machine
should stay level. If it is not level lower the machine
to the ground and adjust the length of the rear chains.
Repeat until you achieve a level lift.
RAIL14SSL0400BA
19
5-9
Содержание 200 Series
Страница 60: ...2 SAFETY INFORMATION 2 44 ...
Страница 130: ...3 CONTROLS AND INSTRUMENTS 3 70 ...
Страница 154: ...5 TRANSPORT OPERATIONS 5 14 ...
Страница 184: ...7 MAINTENANCE L213 and L215 machines with Electro Hydraulic EH controls 47946332B 6 7 20 ...
Страница 185: ...7 MAINTENANCE L218 L220 L223 L225 L230 C227 C232 and C238 machines with Electro Hydraulic EH controls 47946330A 7 7 21 ...
Страница 250: ...7 MAINTENANCE 7 86 ...
Страница 288: ...10 ACCESSORIES 10 2 ...