7 - MAINTENANCE
6. Tip the lower edge of the glass into the cab and drop
down and out of the frame.
Fixed upper glass
7. Slip the screwdriver down into the aluminum track from
the back, and slide forward underneath the front inner
rigid PVC slider channel.
RAIL17SSL0349BA
5
8. Pry upward until you are able to grab hold of the end of
the PVC channel.
9. Using the flat drive end of the screwdriver, place it un-
der the edge of the outer PVC channel as shown and
pry the PVC channel up and out of the aluminum frame.
RAIL17SSL0322BA
6
10. Slide the fixed glass forward until it clears the remain-
ing PVC channel.
11. Tip the lower edge into the cab and drop down and out
of the frame.
7-78
Содержание 200 Series
Страница 60: ...2 SAFETY INFORMATION 2 44 ...
Страница 130: ...3 CONTROLS AND INSTRUMENTS 3 70 ...
Страница 154: ...5 TRANSPORT OPERATIONS 5 14 ...
Страница 184: ...7 MAINTENANCE L213 and L215 machines with Electro Hydraulic EH controls 47946332B 6 7 20 ...
Страница 185: ...7 MAINTENANCE L218 L220 L223 L225 L230 C227 C232 and C238 machines with Electro Hydraulic EH controls 47946330A 7 7 21 ...
Страница 250: ...7 MAINTENANCE 7 86 ...
Страница 288: ...10 ACCESSORIES 10 2 ...