Page 90/ 191
-
Make sure the total cable length of original instal new installation does not exceed
100 meters.
-
If the mounting of the TRON 40VDR requires a long outdoor cable, it is recommended to
put the cable in a separate steel pipe, which is welded to the ship hull. This will protect the
wire against RF signals interfering with the VDR signals.
-
Before final relocation it is advised to do a test with a flying cable to ensure proper
functioning of the TRON 40VDR.
-
It is critical to choose a position where the released EPIRB will not get trapped by
overhangs, rigging, antennas and so forth, in case the vessel will sink.
-
The EPIRB is supplied with an instruction plate that should be mounted next to the EPIRB
so that is easily visible in an emergency.
-
The EPIRB must be installed in the vicinity of the navigation bridge, i.e. on the wings of the
navigation bridge. Access via vertical ladder should not be accepted.
-
Since the mounting location is critical for the performance of the TRON 4VDR, please find
below screenshots out from the TRON 40VDR Installation manual (revision J).
Содержание NW6000
Страница 1: ......
Страница 91: ...Page 91 191...
Страница 92: ...Page 92 191...
Страница 116: ...Page 116 191 Figure 16 4 2 Connection figure NMEA Module 16 channels Figure 16 4 3 Connection table NMEA Modules...
Страница 120: ...Page 120 191 Figure 17 4 2 Connection figure Digital Module 16 channels...
Страница 121: ...Page 121 191 Figure 17 4 3 Connection figure Digital Module 24 channels...
Страница 125: ...Page 125 191 Figure 18 4 2 Connection figure Analogue Module 8 channels...
Страница 126: ...Page 126 191 Figure 18 4 3 Connection figure Analogue Module 12 channels...
Страница 184: ...Page 184 191 Figure 5 8 1 Sample dataset playback...