![NetWave NW6000 Скачать руководство пользователя страница 144](http://html1.mh-extra.com/html/netwave/nw6000/nw6000_installation-operation-and-maintenance-manual_1675342144.webp)
Page 144/ 191
The video source information will be coloured in red when there is no recorded image or when the
time between the connected computer and VDR is not synchronized.
22.4 Annual Performance Test
Netwave Systems recommends performing an Annual Performance Test (APT) every 12 months
referring to MSC.1/Circ.1222.
The VDR page retrieves information from the VDR, that is required for the APT, and will be filled
in automatically in the APT page. Additional information needs to be filled in by the APT performing
certified engineer. Click on the button “Create APT report” to generate the APT in a pdf format.
The pdf file will be stored on the VDR and needs to be send to
certified engineer when performing the APT.
22.5 Configurator
The VDR configurator webpage contains VDR settings that can not be set by the Playback
software. The configurator page also includes tools for configuration and troubleshooting. The
following paragraphs describes each of the settings and tools.
Содержание NW6000
Страница 1: ......
Страница 91: ...Page 91 191...
Страница 92: ...Page 92 191...
Страница 116: ...Page 116 191 Figure 16 4 2 Connection figure NMEA Module 16 channels Figure 16 4 3 Connection table NMEA Modules...
Страница 120: ...Page 120 191 Figure 17 4 2 Connection figure Digital Module 16 channels...
Страница 121: ...Page 121 191 Figure 17 4 3 Connection figure Digital Module 24 channels...
Страница 125: ...Page 125 191 Figure 18 4 2 Connection figure Analogue Module 8 channels...
Страница 126: ...Page 126 191 Figure 18 4 3 Connection figure Analogue Module 12 channels...
Страница 184: ...Page 184 191 Figure 5 8 1 Sample dataset playback...