22
2.
Ignition delay
-
---
Keep up the electrified time of high-voltage ignition.
3.
Preheat delay----It is the preheat time when steel plate perforation, preheat time is adjustable.
When preheat perforation, press
【
Pause
】
key, can delay automatically 150 seconds. Press
【
Startup
】
will stop preheating and save the actual preheat time to parameter.
4.
Cutting gun rising delay
----
It is used usually before G00 transfer .The cutting gun rise to
suitable height in order to avoid knocking between cutting gun and steel plate.
5.
Cutting gun falling delay
----
Contrary to the above item, the cutting gun fall to suitable height.
After transfer the
G00,
you should down the cutting gun before machining
.
Because of gravity, the
time of falling is shorter than rising.
6.
Perforation cutting gun rising
——
Under fixed cycle of preheat perforation, cutting gun rising
rapidly and perforation cutting gun rising delay. This moment open cutting oxygen and cutting gun
begin falling and perforation cutting gun falling delay. Cutting gun rising before open cutting
oxygen in order to avoid jamming the cutting gun’s gate when open cutting oxygen.
7.
Perforation cutting gun falling
——
Its usage refer the above item. Under fixed cycle of
preheat perforation, it will finished after cutting gun falling and perforation cutting gun falling
delay. Because of gravity, the time of falling is shorter than rising.
2.5.4 System parameter
2.5.4 System parameter
2.5.4 System parameter
2.5.4 System parameter
Press
【
F5
】
and select, refer picture below:
Electric gear formula
Electric gear formula
Electric gear formula
Electric gear formula:
N/M=Micrometer
thread
pitch
*1000/(360*subdivision/Stepping
angle*Transmission ratio)
Explaining
:
N—Numerator after simplified.
System parameter settings
Electric gear: X N 00000 M 00000
Electric gear: Z N 00000 M 00000
Subdivision: X 0040 Z 00040
Cutter
Speed
Adjus
t
Contr
ol
Syste
m
Save
www.EngineeringBooksPdf.com
Содержание SNR-BD
Страница 4: ...4 3 Fix the four screws 4 Put the security cover on the beam www EngineeringBooksPdf com...
Страница 5: ...5 5 Fixed the screw of the security cover 6 Install the anti fire plate www EngineeringBooksPdf com...
Страница 38: ...38 5 4 Signal shifting board J7 LCD inverter interface www EngineeringBooksPdf com...