background image

Neo-Pure

®

 RO-4300RX Pharmacy Trusted

Five/One Year Limited Warranty.

What Does This Warranty Cover?

This warranty covers any defects in materials and workmanship of the Neo-Pure

®

 RO-4300RX High Efficiency Reverse 

Osmosis Drinking Water System when installed and operated within recommended parameters, with the exceptions 
stated below.

How Long Does The Coverage Last?

NeoLogic Solutions will warrant its R.O. Drinking Water System (except for the reverse osmosis membrane), for a period 
of five years from the date of purchase. The reverse osmosis membrane is warranted for one year from date of purchase. 
All implied warranties including merchantability and fitness for a particular purpose are limited to five years from the date 
of purchase for the R.O. Drinking Water System, except for the reverse osmosis membrane which is limited to one year from 
date of purchase. Some states do not allow limitations on how long an implied warranty lasts, so the above limitations may 
not apply to you.

What Will NeoLogic Solutions Do?

NeoLogic Solutions will repair or replace at its discretion any defective component. You must pay any labor charges. 
You must also pay for shipping or travel charges to return the defective part(s).

What Does This Warranty Not Cover?

This warranty does not cover the disposable sediment and carbon filters whose service life depends on feed water 
conditions. In addition, the membrane is only warranted if the required feed water conditions are met.

The above warranty will also not apply to any part of the Neo-Pure R.O. Drinking Water System that is damaged because 
of neglect, misuse, alterations, accident, misapplication, physical damage, or damage caused by fire, acts of God, freezing 
or hot waters or similar causes. Consequential and incidental damages are not recoverable under this warranty. Some 
states do not allow the exclusion or limitation of incidental or consequential damages, so the above limitation or exclusion 
may not apply to you.

We recommend that you use only authorized Neo-Pure replacement parts since improper parts or incorrectly performed 
maintenance or repair voids this warranty. In addition, if non Neo-Pure parts are used, contaminant reduction claims 
and/or state approvals are no longer valid.

How Do You Get Service?

In order to be eligible for service under this warranty you must (a) contact your local dealer who supplied the unit 
or (b) contact the factory for the dealer nearest you.

How Does State Law Apply?

This warranty gives you specific legal rights and you may also have other rights which vary from state to state.

All Rights Reserved. Manufacturer reserves the right to make changes without notice. ©2017 NeoLogic Solutions

2299 Ridge Rd., Greenville, SC 29607

Call: 888.859.1188 • Email: [email protected] • Visit: NeoLogicSolutions.com

Distributed By:

21

Содержание RO-4300Rx-DLX

Страница 1: ...The High Efficiency Reverse Osmosis Drinking Water System Installation Operation And Service Manual DLX...

Страница 2: ...ICROBIOLOGICALLY UNSAFE OR OF UNKNOWN QUALITY WITHOUT ADEQUATE DISINFECTION BEFORE OR AFTER THE SYSTEM Systems certified for cyst reduction may be used on disinfected water that may contain filterable...

Страница 3: ...or substances that contribute to tastes and odors IN LINE ACTIVATED CARBON POST FILTER The In Line Activated Carbon Post Filter is located after the Holding Tank and has been designed to reduce the ta...

Страница 4: ...ct 3 8 Blue 6 7 8 Polytube Tee Stage 3 Carbon Post Filter Housing Stage 2 Reverse Osmosis Membrane Housing Stage 1 Sediment Carbon Pre Filter Housing Locate Drain Clamp Above P Trap Feed Water Valve C...

Страница 5: ...this manual Cover RO Manifold Drinking Water Holding Tank Mount Holding Tank On Shelf Or Strap Between Floor Joists Shelf or straps not included Stage 3 Activated Carbon Post Filter Housing Stage 2 Re...

Страница 6: ...ble to the user as reverse osmosis treated water when the system is operated without a storage tank or when the storage tank is bypassed Efficiency rating means the percentage of the influent water to...

Страница 7: ...ws or machine screws and nuts for mounting the manifold or concrete anchors for hanging on basement wall Additional tubing or tube connectors Plastic wire ties for organizing tubing B TOOLS RECOMMENDE...

Страница 8: ...as it will extend the life of the R O Membrane 3 R O Manifold Assembly The manifold can be installed on either the right or left side of the under sink area or a cabinet The right side is recommended...

Страница 9: ...sher Rubber Connector Faucet 3 8 x 7 16 Drain Line From Air Gap To Drain 3 8 Black Tubing Drain Line To Air Gap 1 4 Black Tubing AIR GAP ONLY GRINDING WHEEL Sink Top Metal Porcelain CAUTION Be careful...

Страница 10: ...Punch 5 Set the punch and turn the nut with a wrench to cut the hole D PREPARE THE R O AIR GAP FAUCET ASSEMBLY FOR INSTALLATION 1 Using the diagram in Figure 3 assemble the Air Gap Spigot with all th...

Страница 11: ...ion nut on the feed water supply valve Do not over tighten 10 Reconnect the riser tube to the other end of the feed water supply valve Do not over tighten 11 Fully insert the red 1 4 tube into the spe...

Страница 12: ...Faucet Route the tubing to the Drain Clamp and trim to length NOTE When cutting the polytubing make clean square cuts failing to do so could result in poor connections and possible leaks CAUTION The...

Страница 13: ...hen press firmly again to insure proper seating 19 Locate the White tubing Remove the yellow plug from the fitting labeled Out on the manifold and insert the tubing 20 Locate the 3 8 Blue Product Wate...

Страница 14: ...OSE the Feed Water Valve and open the Dispensing Faucet Allow the Holding Tank to completely drain then remove the Sediment Carbon Filter Housing the farthest of the three from the In Out ports empty...

Страница 15: ...ion it is better to empty the Holding Tank and allow the system to produce fresh water for use If the system is not used for 3 4 weeks or longer it is a good idea to re sanitize the system and to chan...

Страница 16: ...the Faucet in the following order close the Faucet and open the Holding Tank Valve When the Faucet is first opened expect air and carbon fines very fine black powder from the new Post Filter to be ri...

Страница 17: ...tem A The Permeate pump brine side should be installed between the R O System and the air gap faucet connection From the R O plug black tube into BRINE IN port B Connect a new length long enough to re...

Страница 18: ...ASO Valve is malfunctioning In Line Activated Carbon Post Filter is plugged LOW PRESSURE AT THE DISPENSING FAUCET In Line Activated Carbon Post Filter is plugged Replace Post Filter Air precharge in t...

Страница 19: ...gases in the Feed Water Pretreat Feed Water to remove dissolved gases Increase in Product Water TDS See high TDS in the Product Water section AMBER LIGHT ON WATER QUALITY MONITOR System not being used...

Страница 20: ...EXPLODED VIEW AND PARTS LIST 19A Water Quality Test Kit 23 Nitrate Nitrite Test Kit Optional Deluxe Components 17 19 20 14 13 12 11 16 18 10 9 15 1 2 3 4 5 6 7 8 24 25 19...

Страница 21: ...O Membrane 50 gpd 189 lpd Part No CLK TF 50 13 Housing O Ring 14 Housing 15 Water Quality Monitor Board w Probes 16 Drain Restrictor 50 GPD 189 lpd Green 17 Cover 18 Activated Carbon Post Filter Part...

Страница 22: ...t and carbon filters whose service life depends on feed water conditions In addition the membrane is only warranted if the required feed water conditions are met The above warranty will also not apply...

Отзывы: