SL2100 GETTING STARTED GUIDE
30
3.3 Connecting Earth Ground
The ETH (Earth Ground Lug) is located near the AC power inlet on each Chassis.
In each Chassis, connect the ETH lug to the verified grounding point using a minimum cable size of
14AWG (
Φ
2.0 mm) wire.
!!
Ensure all Main and Expansion Chassis are powered off and unplug the AC cord.
The grounding cable is supplier-provided (not attached to the system).
Each chassis in the system must be grounded separately using the procedure listed below.
1. Loosen the screw.
2. Insert a grounding wire (supplier provided).
3. Tighten the screw.
4. Connect the grounding wire to earth ground.
!!
Proper grounding is very important to protect the system from external noise and to
reduce the risk of electrocution in the event of a lightning strike.
3.4 Connect AC power cord
The AC power inlet is located at the back side of each chassis. The AC power cord is connected to
the AC inlet and the commercial AC power socket.
!! Each Chassis must have its own commercial AC power socket.
Содержание UNIVERGE SL2100
Страница 18: ...SL2100 GETTING STARTED GUIDE 14 MEMO...
Страница 23: ...SL2100 GETTING STARTED GUIDE 19 1 7 System Connection Diagram Figure 1 1 shows a system connection diagram...
Страница 48: ...SL2100 GETTING STARTED GUIDE 44 5 Attach the phone to the wall...
Страница 77: ...SL2100 GETTING STARTED GUIDE 73 MEMO...
Страница 78: ...Getting Started Guide NEC Corporation Issue 1 0...