77
Connect the cables removed in step (1) to the mating connectors as before.
After connecting the cables, close the ejector.
Strongly push the ejector (the part indicated by the arrow in the figure) until the controller is
inserted firmly, and secure the ejector with the screw.
When inserting the controller into the array controller, push it as far as it will go and
then secure it with the screws.
Incorrect insertion may cause a malfunction.
At the startup immediately after replacement, write back the IP address of the old
controller to the new controller. If the controller was replaced with a new one, the
system starts using the IP address specified for the new controller. Therefore, a
maintenance PC and NEC Storage Manager cannot connect with the old IP
address. To connect with a maintenance PC and NEC Storage Manager, perform
either of the following procedures:
(1) Connect by using the default IP address.
(2) Wait at least three minutes after the controller starts flashing, remove the
replaced controller, insert it again, then connect by using the IP address of the
old controller.
Содержание NF2900-SR40E
Страница 8: ...v ...
Страница 9: ...vi ...
Страница 10: ...vii ...
Страница 13: ...x NF2900 SR40E ...
Страница 24: ...7 ...
Страница 43: ...26 ...
Страница 52: ...35 Sample configuration 1 NF2900 SR40E NF2900 SP02E NF2500 SE42E 16 ...
Страница 65: ...48 capacity and rotational speed be used together ...
Страница 76: ...59 Be careful as this may be hot ...
Страница 80: ...63 Note The figure above indicates the addition of NF2900 SC01E ...
Страница 133: ...116 DE Location View DE00 DE01 DE05 DE09 DE0 DE0 DE04 DE08 DE03 DE07 DE0 DE0 DE02 DE06 DE0 DE0 ...
Страница 134: ...117 1 2 5 Network Property Select 4 Configuration 7 Network Property to set the following items ...