
2-18 General Description
POWER Switch
Use the POWER switch to turn on/off the server.
Power On
Press the POWER switch on the front of the computer chassis.
The POWER/SLEEP lamp lights in green.
IMPORTANT:
If the power cord is connected to a power control device such as a
UPS (Uninterruptible Power Supply), make sure that the power
control device is powered.
If the power cord is connected to the server, an initial diagnosis of
the hardware starts. The POWER switch does not work while in
diagnosis. Wait for about 10 seconds, then press the POWER
switch.
Always allow POST to complete before powering down your
system (see the next subsection for POST).
POWER/SLEEP lamp
Содержание Express 5800/120Lh
Страница 1: ...N8100 941F 942F 943F NEC Express5800 120Lh User s Guide 1st Edition 08 2004 856 124032 101 00 ...
Страница 35: ...General Description 2 9 MOTHER BOARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 19 16 18 21 22 23 24 25 20 ...
Страница 138: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 174: ...7 12 Maintenance This page is intentionally left blank ...
Страница 265: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Страница 274: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Страница 276: ...A 2 Specifications This page is intentionally left blank ...
Страница 314: ...F 4 Product Configuration Record Table This page is intentionally left blank ...