
Upgrading Your Server 9-13
8.
Close the lever ensuring it is secured. The handle is locked with a click.
IMPORTANT:
Note that your fingers may not be caught between the
handle and the tray.
NOTE:
Make sure that the hook of the handle is hanged on the frame.
9.
Close the door opened in step 2.
Hook
Handle
Frame
Содержание Express 5800/120Lh
Страница 1: ...N8100 941F 942F 943F NEC Express5800 120Lh User s Guide 1st Edition 08 2004 856 124032 101 00 ...
Страница 35: ...General Description 2 9 MOTHER BOARD 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 19 16 18 21 22 23 24 25 20 ...
Страница 138: ...5 46 Installing the Operating System with Express Setup This page is intentionally left blank ...
Страница 174: ...7 12 Maintenance This page is intentionally left blank ...
Страница 265: ...Chapter 10 Internal Cabling Diagrams Internal cable connections of the server are shown below ...
Страница 274: ...10 10 Internal Cabling Diagrams This page is intentionally left blank ...
Страница 276: ...A 2 Specifications This page is intentionally left blank ...
Страница 314: ...F 4 Product Configuration Record Table This page is intentionally left blank ...