Installing and Using Utilities 5-95
Managing Critical Applications During the Upgrade Process
The Active Upgrade Console enables to specify how business-critical applications are started and
stopped during the Active Upgrade process.
If your NEC Express5800/ft series system runs business-critical applications, such as Microsoft
Exchange Server or SQL Server, these applications can run on only one side of the system—the
Production Side—when you split the system. They must be stopped on the other side—the Upgrade
Side—to prevent resource conflicts and to allow you to proceed with upgrade tasks. Furthermore,
when you merge the system, the same applications must be stopped on the Production Side and
restarted on the Upgrade Side, so you can test the applications with the newly-upgraded system disk,
and possibly commit the upgrade.
In general, critical applications are launched and exited automatically by the operating system. For
example, your application might be configured to launch as a service in the Services Control
Manager, or as a startup item in the system registry. But these resources control your applications
only when the operating system itself is launched or exited. In most cases, to minimize downtime,
the Active Upgrade Console executes upgrade operations, like split and merge,
without
restarting
the operating system. Therefore, if you want to launch and exit your applications at the appropriate
times during the upgrade process, you must configure the Active Upgrade Console itself to control
the applications
Active Upgrade Console provides two methods for controlling your critical applications during the
upgrade process. The method you use for each application depends on the type of application you
want to control:
•
Application services
If your application runs as a standard service that already accounts for interdependencies (with
other services) and requires no special handling, you can specify it on the
Application
Services
page of the Active Upgrade Console during the configuration process. On the
Application Services
page, you can select each service you want to manage from the list of
services on your system, and, when you start the upgrade process, the Active Upgrade Console
will automatically start and stop these services at the appropriate times. See “Selecting
Application Services to Control” on page 5-119 for more information.
•
Custom actions
If you have a custom application or integrated applications from several different software
vendors, and you have special executables that start and stop these applications, you can specify
the executables on the
Custom Actions
page of the Active Upgrade Console during the
configuration process. Using the controls on the
Custom Actions
page, you can specify when
your executables will run during the upgrade process, and, if you have several executables, you
can specify the order in which they will run. See “Configuring Custom Actions” on page 5-123
for more information.
TIPS:
Software Upgrade Support, page 5-90
Selecting Application Services to Control, page 5-119
Configuring Custom Actions on page 5-123
Содержание EXP320J
Страница 12: ... THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 25: ...xiii APPENDIX A SPECIFICATIONS A 1 APPENDIX B I O PORT ADDRESSES B 1 ...
Страница 26: ...xiv THIS PAGE IS INTENTIONALLY LEFT BLANK ...
Страница 28: ...1 2 Precautions for Use 使用上的注意 本章包含著對服務器恰當安全的操作必要的信息 ...
Страница 54: ...1 28 Precautions for Use This page is intentionally left blank ...
Страница 64: ...2 10 General Description Rear View ...
Страница 68: ...2 14 General Description CPU IO Module CPU IO module ...
Страница 88: ...2 34 General Description This page is intentionally left blank ...
Страница 100: ...3 12 Windows Setup and Operation 3 Confirm that RDR of the disk is cancelled ...
Страница 101: ...Windows Setup and Operation 3 13 4 Cancel the disk of the corresponding slot in the same manner ...
Страница 218: ...4 92 System Configuration This page is intentionally left blank ...
Страница 253: ...Installing and Using Utilities 5 35 DIMM Allows the information of DIMM on the CPU modules to be viewed ...
Страница 390: ...5 172 Installing and Using Utilities This page is intentionally left blank ...
Страница 408: ...6 18 Maintenance 3 Stop of PCI module 1 4 Start of PCI module 1 ...
Страница 410: ...6 20 Maintenance This page is intentionally left blank ...
Страница 454: ...7 44 Troubleshooting This page is intentionally left blank ...
Страница 485: ...System Upgrade 8 31 board must not be mixed with N8804 005 or N8803 035 ...
Страница 500: ......
Страница 503: ......