Chapter 11 METER SETTING
11.1 SETUP Screen
F-52, 53, 54, 55
129
Chapter 11
METER SETTING
The setting procedure described in this section is common to every measurement item. Select
the item from the SETUP screen to begin.
11.1
SETUP Screen
There are two ways to open the SETUP screen:
●
From the Measurement screen
1.
In the Instantaneous Measurement
screen, press the ESC key.
The SETUP screen appears.
●
From power ON
This is effective only when the USER MAN-
AGEMENT is OFF.
1.
Turn the power ON.
The startup screen appears, and the
display automatically moves to the
SETUP screen.
When the User Control is set to ON, turning
the power ON moves the display to the
SELECT OPERATOR screen after the
startup screen appears.
Содержание F-52
Страница 2: ......
Страница 13: ...TABLE OF CONTENTS X HORIBA...
Страница 31: ...Chapter 1 Overview 1 9 Security Function 18 HORIBA...
Страница 41: ...Chapter 2 BASIC OPERATIONS 2 5 Navigation Function 28 HORIBA...
Страница 103: ...Chapter 5 Ion Measurement F 53 55 5 5 Check Display 90 HORIBA...
Страница 125: ...Chapter 8 RESISTIVITY MEASUREMENT F 54 55 8 2 Setting Configuration 112 HORIBA...
Страница 165: ...Chapter 11 METER SETTING 11 8 FDA Part 11 Function Audit Trail F 55 152 HORIBA...
Страница 187: ...Chapter 13 ANALOG OUTPUT 13 3 Alarm Output 174 HORIBA...
Страница 227: ...Chapter 15 Maintenance and troubleshooting 15 2 Troubleshooting 214 HORIBA...