[ 14 ]
NATIONAL RAMP
™
| FREEDOM
NOW
LANDING PAD
RAMP BOTTOM TRANSITION PLATE (BTP)
A solid aluminum 5'x5' platform placed directly onto
the ground to provide a solid, level landing surface
when the ramp would otherwise end on soft ground.
The bottom transition plate is the landing area of the
ramp, allowing a smooth transition on and off the
ramp’s end. On a 36" wide ramp, the BTP is the last
foot of ramping, on a 48" wide bariatric ramp, the BTP
is two feet long.
RAMP SECTION
PLATFORM
The standard Liberty Series™ ramp section is 36” wide.
Liberty Series™ ramp sections can be installed level or
sloped.
Platforms offer a variety of uses as a level surface on
your ramp system. They can create a solid surface at
the start of the ramp, change the direction of the ramp,
navigate the ramp around a large obstacle, or provide
a level rest area.
PIE PLATFORM
BARIATRIC RAMP SECTION
A platform to turn the ramp’s direction by 45°. Pie
platforms are named (left or right) for the direction the
ramp turns as you travel down the ramp from the ramp
start.
Pictured is a right pie platform.
Liberty Series™ ramping is available in a 48" wide,
bariatric version, which has the same functionality as
the standard 36" wide ramping. Customers choose
bariatric ramping for mobility devices that are too
wide to fit on the standard ramping.
48" wide
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision:
Date:
Width:
Length:
Elevation:
Customer:
Project:
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision:
Date:
Width:
Length:
Elevation:
Customer:
Project:
36" wide
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision:
Date:
Width:
Length:
Elevation:
Customer:
Project:
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision:
Date:
Width:
Length:
Elevation:
Customer:
Project:
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision: Date:
Width:
Length:
Elevation:
Customer:
Project:
A
A
B
B
C
C
D
D
E
E
F
F
8
8
7
7
6
6
5
5
4
4
3
3
2
2
1
1
Sheet of
Scale:
PROPRIETARY AND CONFIDENTIAL
COPYRIGHT NATIONAL RAMP. ALL RIGHTS RESERVED.
ALL TEXT AND IMAGES CONTAINED IN THIS
DOCUMENT ARE PROPRIETARY AND MAY NOT BE
SHARED, MODIFIED, DISTRIBUTED, REPRODUCED, OR
REUSED WITHOUT THE EXPRESS WRITTEN PERMISSION
OF NATIONAL RAMP.
NOTES:
1. FOOT PLACEMENT DIMENSIONS MUST BE VERIFIED BASED ON FIELD CONDITIONS AND ACTUAL INSTALL
2.MAXIMUM SLOPE-1:12(8.33%)
3.MAXIMUM CROSS SLOPE-1:48 (1/4''/FOOT)
4.ALL RAMPS & PLATFORMS 36'' AND OVER ELEVATION REQUIRE CROSS BRACING
Approved:
Drawn:
Revision: Date:
Width:
Length:
Elevation:
Customer:
Project:
Содержание ALUMINUM SOLID
Страница 2: ... 2 NATIONAL RAMP FREEDOM NOW 2020 National Ramp All Rights Reserved ...
Страница 6: ... 6 NATIONAL RAMP FREEDOM NOW ...
Страница 26: ... 26 NATIONAL RAMP FREEDOM NOW ...
Страница 27: ... 27 Liberty Series Ramp Installation Guide Revision 8 1 2020 EVALUATION OVERVIEW ...
Страница 38: ... 38 NATIONAL RAMP FREEDOM NOW ...
Страница 39: ... 39 Liberty Series Ramp Installation Guide Revision 8 1 2020 OVERVIEW OF THE LIBERTY SERIES SYSTEM ...
Страница 48: ... 48 NATIONAL RAMP FREEDOM NOW www nationalramp com 877 884 RAMP 7267 ...
Страница 49: ... 49 Liberty Series Ramp Installation Guide Revision 8 1 2020 RAMP INSTALL ...
Страница 101: ... 101 Liberty Series Ramp Installation Guide Revision 8 1 2020 RAMP INSTALL ...
Страница 102: ... 102 NATIONAL RAMP FREEDOM NOW www nationalramp com 877 884 RAMP 7267 ...
Страница 129: ... 129 Liberty Series Ramp Installation Guide Revision 8 1 2020 TWO LAYOUT CONFIGURATION START TO FINISH ...
Страница 130: ... 130 NATIONAL RAMP FREEDOM NOW www nationalramp com 877 884 RAMP 7267 ...
Страница 131: ... 131 Liberty Series Ramp Installation Guide Revision 8 1 2020 RAMP MAINTENANCE AND CARE ...
Страница 137: ... 137 Liberty Series Ramp Installation Guide Revision 8 1 2020 2020 National Ramp All Rights Reserved ...
Страница 138: ... 2020 National Ramp All Rights Reserved ...