Section 75
00-02-0878
2013-03-07
- 20 -
Running Mode Description
Manual Mode
The unit can be operated in manual mode (MAN). Manual means that the unit will not
initiate any sequences automatically, as is the case with the auto mode. It will only
initiate sequences, if external signals are given.
An external signal may be given in three ways:
1. Start and Stop and MAN push-buttons on the display are used
2. Digital inputs are used
3. Modbus command at service port or RS 485
NOTE:
The standard EMS-GC10 is only equipped with a limited
number of digital inputs, please see "Digital inputs" in this
document for additional information about availability.
The following sequences can be activated in manual mode:
Command
Description
Comment
Start
The start sequence is initiated and continues until the genset starts or
the maximum number of start attempts has been reached.
First start: include
preheat
Second start: cancel
preheat
Stop
The genset will be stopped. After disappearance of the running signal,
the stop sequence will continue to be active in the ‘"extended stop
time" period. The genset is stopped with cooling down time.
The cooling down
time is cancelled if
the stop button is
activated twice.
Close GB
The unit will close the generator breaker if the mains breaker is open
Open GB
The unit will open the generator breaker instantly
Close MB
The unit will close the mains breaker if the generator breaker is open
Open MB
The unit opens the mains breaker instantly.
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...