Section 75
00-02-0878
2013-03-07
- 115 -
Configuration of the User View
This configuration is done in the PC Utility Software (USW) by pressing the User View icon in
the horizontal toolbar.
Activation of Auto Views
The extra view lines are displayed if the parameter 7564 is switched to “ON” and the engine
CAN bus is active. Note that it might be necessary to start the engine before switching 7564 to
“ON”. The setting automatically returns to “OFF”.
To deactivate the Auto View function, please follow the steps below:
1. Adjust Engine I/F type to “OFF” (parameter 7561).
2. Adjust EIC AUTOVIEW to “ON” (parameter 7564).
3. Adjust EIC AUTOVIEW to “OFF” (parameter 7564).
(The parameter is not reset automatically when no engine is selected).
Verification of J1939 Objects
To verify the communication, various CAN PC tools can be used. Common for these are that
they must be connected to the CANbus between the EMS-GC10 unit and the engine controller.
When the tool is connected, it is possible to monitor the communication between the two units.
For use of the CAN tool, please refer to the manual for the product used.
As an example, you may see the following telegram:
0xcf00400 ff 7d 7d e0 15 ff f0 ff
DATA BYTE: 1 2 3 4 5 6 7 8
-0xc is the priority
-f004 is the PGN number (61444 in decimal value)
-The 8 bytes following the CAN ID (Oxcf00400) are data, starting with byte 1
The priority needs to be converted to decimal. Note that the 3 priority bits in this case are
displayed in the CAN id (You see Oxcf00400 instead of 0x0cf00400). In other cases you may
read (e.g., 0x18fef200 [PGN 65266]).
The formula to find the priority number (P) is to divide by 4:
0xc = 12 (Dec) => Priority 3
Priority
DecID
DecID
1
4d
0x4
2
8d
0x8
3
12d
0xc
4
16d
0x10
5
20d
0x14
6
24d
0x18
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...