
Section 75
00-02-0878
2013-03-07
- 78 -
Service Timers
The unit is able to monitor the maintenance intervals. Two service timers are available
to cover different intervals. The service timers are set up in parameters 6110, 6113,
6114, 6116, and 6120, 6121, 6123, 6126.
The function is based on running hours. When the adjusted time expires, the unit will
display an alarm. The running hours is counting when the running feedback is present.
Setpoints available in parameters 6110, 6111, 6113, 6116, and 6120, 6121, 6123,
6126:
Enable
Enable/disable the alarm function.
Running
hours
The number of running hours to activate the alarm. The service timer
alarm will be activated as soon as the running hours have been
reached.
Day
The number of days to activate the alarm – if the running hours are
not reached before this number of days, the alarm will still be
activated. The service timer alarm will be activated at 8:00 AM on
the day the alarm expires.
Fail class
The fail class of the alarm.
Output A
:
Relay to be activated when the alarm is activated.
Reset
Enabling this will reset the service timer to zero. This must be done
when the alarm is activated.
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...