
Section 75
00-02-0878
2013-03-07
- 76 -
Engine Running
Fail Class Action
Alarm Horn
Relay
Alarm
Display
Trip Of Gen.
Breaker
Trip Of Mains
Breaker
Cooling-
Down Genset
Stop
Genset
1 Block
X
X
2 Warning
X
X
3 Trip GB
X
X
X
4 Trip + stop
X
X
X
X
X
5 Shutdown
X
X
X
X
6 Trip MB
X
X
X
7 Trip MB/GB
X
X
(X)
X
The table illustrates the action of the fail classes. If, for instance, an alarm has been
configured with the "shutdown" fail class, the following actions occur.
•
The alarm horn relay will activate
•
The alarm will be displayed in the alarm info screen
•
The generator breaker will open instantly
•
The genset is stopped instantly
•
The genset cannot be started (see next table)
NOTE:
The fail class "Trip MB/GB" will only trip the generator
breaker if there is no mains breaker present.
Engine Stopped
Fail Class
Action
Block Engine Start
Block MB Sequence
Block GB Sequence
1 Block
X
2 Warning
3 Trip GB
X
X
4 Trip + stop
X
X
5 Shutdown
X
X
6 Trip MB
X
7 Trip MB/GB
(X)
X
(X)
NOTE:
In addition to the actions defined by the fail classes, it is
possible to activate one or two relay outputs if additional relays are
available in the unit.
NOTE:
The fail class "Trip MB/GB" will only block engine start and
GB sequence if no mains breaker is present.
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...