Section 75
00-02-0878
2013-03-07
- 81 -
Functional Description—Input
1.
Shutdown override
This input deactivates all protections except the over speed protection and the
emergency stop input. The number of start attempts is seven by default, but it can be
configured in parameter 6201. Also a special cool down timer is used in the stop
sequence after an activation of this input.
2. Access lock
Activating the access lock input deactivates the control display push-buttons. It will only
be possible to view measurements, alarms and the log.
3. Binary running detection
The input is used as a running indication of the engine. When the input is activated, the
start relay is deactivated.
4. Remote start
This input initiates the start sequence of the genset when semi-auto or manual mode is
selected.
5. Remote stop
This input initiates the stop sequence of the genset when semi-auto or manual mode is
selected. The genset will stop without cooling down.
6. Test
Changes the present running mode to test.
7. Auto
Changes the present running mode to auto.
8. Manual
Changes the present running mode to manual.
9. Block
Changes the present running mode to block.
NOTE:
When block mode is selected, the running mode cannot be
changed by activating the digital inputs.
10. Remote GB ON
The generator breaker ON sequence will be initiated and the breaker will close if the
mains breaker is opened.
11. Remote GB OFF
The generator breaker OFF sequence will be initiated.
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...