![Murphy EMS-GC10 Скачать руководство пользователя страница 22](http://html1.mh-extra.com/html/murphy/ems-gc10/ems-gc10_operators-manual_1857843022.webp)
Section 75
00-02-0878
2013-03-07
- 16 -
Underfrequency (81)
Voltage unbalance (60)
Display
Push-buttons for start and stop
Push-buttons for breaker operations
Status texts
M-Logic
Simple logic configuration tool
Selectable input events
Selectable output commands
Terminal Strip Overview
Reference to Installation Instructions
Information about terminal strip overview and rear side controller view can be found in
the "Installation Instructions", which is located on FW Murphy website under
documentation for EMS-GC10.
Measurement Systems
EMS-GC10 unit is designed for measurement of voltages between 100 and
690Vpp AC. For further reference, the AC wiring diagrams are shown in the
Installation Instructions. In parameters 9130, 9131 the measurement principle
can be changed between three-phase, single phase and split phase.
IMPORTANT: Configure EMS-GC10 to match the correct
measuring system. When there is a doubt, contact the
switchboard manufacturer for information about the required
adjustment.
NOTE:
EMS-GC10 unit has four sets of nominal generator
settings, which can be enabled individually in the different
measurement systems.
Содержание EMS-GC10
Страница 1: ...00 02 0878 Section 75 2013 03 07 GensetControllerUnit ModelEMS GC10 Operator sManual ...
Страница 14: ...Section 75 00 02 0878 2013 03 07 8 Menu Structure Diagram ...
Страница 32: ...Section 75 00 02 0878 2013 03 07 26 Mode Shift NOTE To enable mode shift a digital input has to be set up ...
Страница 33: ...Section 75 00 02 0878 2013 03 07 27 MB Open Sequence ...
Страница 34: ...Section 75 00 02 0878 2013 03 07 28 GB Open Sequence ...
Страница 35: ...Section 75 00 02 0878 2013 03 07 29 Stop Sequence ...
Страница 36: ...Section 75 00 02 0878 2013 03 07 30 Start Sequence ...
Страница 37: ...Section 75 00 02 0878 2013 03 07 31 MB Close Sequence ...
Страница 38: ...Section 75 00 02 0878 2013 03 07 32 GB Close Sequence ...
Страница 39: ...Section 75 00 02 0878 2013 03 07 33 Load Takeover LTO ...
Страница 40: ...Section 75 00 02 0878 2013 03 07 34 Island Operation ...
Страница 41: ...Section 75 00 02 0878 2013 03 07 35 Automatic Mains Failure AMF ...
Страница 42: ...Section 75 00 02 0878 2013 03 07 36 Test Sequence ...
Страница 48: ...Section 75 00 02 0878 2013 03 07 42 Stop Sequence The drawings illustrate the stop sequence ...
Страница 74: ...Section 75 00 02 0878 2013 03 07 68 Start ...
Страница 75: ...Section 75 00 02 0878 2013 03 07 69 Stop ...
Страница 183: ...Section 75 00 02 0878 2013 03 07 177 ...