57
Installation Instructions for:
Mini Output Monitor MA-OR
Installation
1. Fit the box in position using the mounting details below.
2. Connect the unit according to the diagram below.
3. Recommended cable Type FPLP (plenum cable), Type FPLR (riser cable), or Type FPL
Standard Connections
Loop In
Loop Out
A
n
a
lo
g
u
e
A
d
d
re
ss
a
b
le
L
o
o
p
3
5
m
m
1
8
.5
m
m
63 m m
Dimensions
Mounting Details
(Drilling positions, template over leaf)
3
7
.5
m
m
20 m m
Notes:
1. Only connect cable screen to its adjacent earth terminal.
2. Output relay are volt-free contacts and are not monitored.
Specification
UL864 9
th
Edition
Содержание MA-1000
Страница 2: ...1 ...
Страница 3: ...2 ...
Страница 15: ...14 MA 1000 ...
Страница 17: ...16 Peripheral Devices ...
Страница 62: ...61 Appendix 4 9 MA 1000 Site Installer User Manual ...
Страница 63: ...62 ...
Страница 71: ...70 ...
Страница 76: ...75 FIGURE 12 Allocated devices list ...
Страница 80: ...79 FIGURE 14 Allocated List ...
Страница 84: ...83 6 Select Delete Device button FIGURE 19 Select Device ...
Страница 88: ...87 Save as TXT format ...
Страница 89: ...88 Panel outputs Save as EXEL format ...
Страница 90: ...89 2 2 13 History Events 1 Select Read History button FIGURE 23 Read History FIGURE 23 Save Event list ...
Страница 91: ...90 FIGURE 21 View Event 2 History will display automatically in the default browser ...
Страница 93: ...92 4 Select Add panel or Delete panel 5 Select Close to apply ...
Страница 98: ...97 ...
Страница 103: ...102 Fig 1 ...
Страница 105: ...104 Appendix 4 12 Detectors UL Certifications ...
Страница 106: ...105 ...
Страница 107: ...107 ...