USER MANUAL SWG
Page 122 of 129
13.1.
General Instructions for the heated sampling lines
For the save operation of the sample line it is important that it is installed
correctly. This includes the following points:
•
The bending radius as given below is maintained,
•
The entire line is rolled out before put into operation,
•
Both ends of the sample line are connected correctly,
•
For thermal and mechanical reasons it shall be supported by a
cable duct along the line,
•
The heated sampling line shall be supported close to the
analyser cabinet and probe housing, for example by using a
separate stilt,
•
There are no extreme temperature variations along the line, as
placed in the mid of the line.
Unpacking of the heated sampling line
A wrong and careless use of the sample line may cause damage. Especially on
very long heated sampling lines the right unpacking and rolling out is
important.
•
DANGER
Fire hazard
Never power up the heated sampling line in coiled condition.
Wrong
Right
Don`t tear the heated sampling line out. -
> Cause sharp kink.
Roll the heated sampling line smooth out.
Содержание SWG 100 SYNGAS
Страница 1: ...SWG 100 SYNGAS USER MANUAL ...
Страница 12: ...USER MANUAL SWG Page 12 of 129 11 H3PO4 inlet G1 8 inner thread ...
Страница 24: ...USER MANUAL SWG Page 24 of 129 ...
Страница 32: ...USER MANUAL SWG ...
Страница 63: ...USER MANUAL SWG Page 63 of 129 Detail A Alarm Relais ...
Страница 75: ...USER MANUAL SWG Page 75 of 129 Leave the menu and safe the adjustments The individual configuration is done ...
Страница 89: ...USER MANUAL SWG Page 89 of 129 8 3 Description of the analyser 1 1 1 1 2 ...
Страница 99: ...USER MANUAL SWG Page 99 of 129 ...
Страница 110: ...USER MANUAL SWG Page 110 of 129 12 Appendix ...
Страница 114: ...USER MANUAL SWG Page 114 of 129 ...
Страница 116: ...USER MANUAL SWG Page 116 of 129 Positions of the components 3 4 ...
Страница 127: ...USER MANUAL SWG Page 127 of 129 ...
Страница 129: ...USER MANUAL SWG Page 129 of 129 ...