FRU Tools and Materials
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
1-18
Introduction
The following is a list of the FRUs for the Microcell unit and a list of the
tools and materials necessary to perform the FRU installation and
removal procedures:
List of FRUs
The following is a list of FRUs for the unit:
1. Site I/O Junction Box with Primary Surge Suppressor – Kit T450AE
2. Site I/O Junction Box without Primary Surge Suppressor – Kit
T450AA
3. RGPS Head – Kit T472AP
4. Short Duration Battery – Kit T348AE
5. Primary Surge Suppressor – Kit T449AA
6. AC Installation Box – Kit T449AB
MicroCell
1. A Band BTS with HSO – Kit SG1478AA
2. A Band BTS without HSO – Kit SG1479AA
3. B Band BTS with HSO – Kit SG1486AA
4. B Band BTS without HSO – Kit SG1487AA
5. Solar Cover – Kit T451AA
6. Fin Cover – Kit T389AB
Required Tools and Materials
to Perform FRU Procedures
Table 1-4 lists the required tools and materials to perform the FRU
installation procedures.
Table 1-4: Required Tools and Material to Perform FRU Procedures
Hand Tools
Materials
Power Tools
T30 Torx tamper bit, 1/4–in. hex
Applicable FRU
None Required
T20 Torx tamper bit, 1/4–in. hex
Installation handles
Torque driver wrench, 1/4–in hex
female drive, 0–10 N–M
(optional)
13 mm torque wrench
5/16 breakaway torque wrench
13/16 breakaway torque wrench
1
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...