Installation and ATP Order
– continued
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
1-28
11. Test equipment setup (test set calibration/GPIB address & clock
setup)
12. Test equipment selection
13. Power meter calibration
14. Test cable calibration
15. Create CAL file
16. RF path audit
17. TX and RX acceptance tests
18. Subscriber unit test and setup
19. Generate an ATP report
20. Copy LMF CAL file to CBSC
21. Terminate LMF session/leave the site
Frequency Hopping Pilot
Beacon (FHPB) ATP Order
The ATP for a MicroCell that is configured as a Frequency Hopping
Pilot Beacon is performed in the following sequence:
1. Create CAL file
2. RF path audit
3. TX and RX Acceptance tests
4. Generate an ATP Report
5. Copy LMF CAL file to CBSC
6. Terminate LMF session/leave the site
1
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...