Required Documents
DRAFT
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
JAN 2002
1-10
Required Documents
The following documents are required to perform the installation, ATP
and FRU procedures of the cell site equipment:
SC
300 BTS Hardware Installation, ATP and FRU – 68P09224A55
(This manual)
Grounding Guidelines for Cellular Radio Installations –
68P81150E62.
CDMA LMF Operator’s Guide – 68P64114A78.
Site Document (generated by Motorola Systems Engineering), which
includes:
– site specific documentation
– channel allocation
– contact list (customer)
– ancillary/expendable equipment list
– site wiring lists
– contact list (Motorola support)
– job box inventory
Demarcation Document (Scope of Work agreement)
Installation manuals for non-Motorola equipment (for reference
purposes).
1
Содержание SC 300
Страница 30: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 1 ...
Страница 60: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 2 ...
Страница 76: ...Table of Contents continued DRAFT SC 300 1X BTS Hardware Installation ATP and FRU Procedures JAN 2002 Notes 3 ...