Dimensions and Clearances
– continued
JAN 2002
2-9
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Table 2-4 Minimum Clearances for Surge Suppressor
Vertical Mounting
Item
Front
Back
Left
Right
Top
Bottom
Installation and
Maintenance
Requirements
600 mm
23.62 in.
0
200 mm
7.87 in.
200 mm
7.87 in.
0
0
Functional
Requirements
(without solar
cover)
0
0
100 mm
3.93 in.
100 mm
3.93 in.
0
0
Functional
Requirements
(with solar cover)
0
0
0
0
0
0
2