Unpacking the Equipment and Inspecting for Damage
– continued
JAN 2002
3-3
SC
300 1X BTS Hardware Installation, ATP, and FRU Procedures
DRAFT
Inspect items for:
dents
scratches
bent pins in connectors
squareness of bracket
damage to heatsink fins
isolating pads, washers on mounting bracket
frayed cabling or chafed connectors
3